    SAN RAFAEL HYDROELECTRIC POWER PLANT

    ACCIONA Industrial finalised the hydroelectric power plant on the location of the current San Rafael dam on the Santiago river in the Mexican state of Nayarit.

    GENERAL INFORMATION

    Location
    Nayarit, Mexico
    Client
    SGSR, Sociedad Generadora de San Rafael
    Capacity
    Three turbines of 9.69 MVA to 8.72 MW
    Contract type
    EPC - Engineering, Procurement, Construction, and Launch
    Year construction ended
    February 2016