    CCI Baja California Sur III

    ACCIONA Industrial designed, supplied, built, and commissioned a 42 MW electrical generation plant.

    ACCIONA Industrial designed, supplied, built, and commissioned a 42 MW electrical generation plant, made up of an Internal Combustion Engine-Generator fuelled by fuel oil, including a 230 kW substation and auxiliaries. The project lasted 27 months.

    The plant includes a steam turbine that ends the thermal cycle by using the hot exhaust gases to generate additional clean energy. In addition, over 300 km of electrical wires were run and 50,000 diameter inches of pipes laid for the different systems.

    GENERAL INFORMATION

    Location
    La Paz, Baja California Sur (Mexico)
    Client
    CFE
    Capacity
    42 MW
    Contract type
    Design, supply, construction, and commission
    Year construction ended
    2014

    Image Gallery

    discover other flagship projects

    Noor I

    , Morocco

    ACCIONA Industrial helped to construct this 160 MW solar thermal energy plant in the province of Ouarzazate, Morocco. This marks the largest contract awarded to a Spanish company in Morocco.

    Kathu

    Northern Cape, South Africa

    ACCIONA Industrial has broken ground on this 100 MW solar thermal power plant in the province of Northern Cape, South Africa.

    Move up